Case Study // 05

Morelli
— Clinton Township, MI

Location

Clinton Township, Michigan

Scope

Commercial Concrete & Asphalt Replacement

D&J Contracting completed targeted concrete improvements and full-depth asphalt replacement for the Morelli property. The project included a new thickened-edge sidewalk, replacement of 6-inch concrete pavement and curb, and reconstruction of failed asphalt areas using a compacted aggregate base, 1100L binder course, and 5E1 surface course.

Fresh asphalt surface being poured in a parking lot beside a commercial building
Commercial Concrete & Asphalt Replacement

PROJECT SPECIFICATIONS

PROJECT SPECIFICATIONS

The Morelli project combined concrete replacement with full-depth asphalt reconstruction in designated areas of the property.

OPERATIONAL LOG // MATERIAL VERIFICATION     REF: MORELLI-CLNT-TWP-2026

01

Concrete Work

  • 280.25 square feet of thickened-edge concrete sidewalk at the front of the building.
  • 1,725 square feet of existing 6-inch concrete pavement removed and replaced.
  • 5 linear feet of existing concrete curb removed and replaced.
  • 4 to 6 inches of 4,000 PSI ready-mix concrete installed and finished to match existing elevations and surrounding surfaces.

02

Full-Depth Asphalt Replacement

  • Failed asphalt pavement and unsuitable base materials removed to the required depth.
  • Existing subgrade and base evaluated, reshaped, graded, and proof-rolled.
  • Suitable aggregate base installed and compacted where required.
  • SS-1 bond coat applied to prepared surfaces and existing asphalt edges.
  • New 1100L asphalt binder course installed and compacted.
  • New 5E1 asphalt surface course installed and compacted.
  • Saw-cut perimeter joints band-sealed where the new pavement meets the existing asphalt.

Diagnostic Portfolio

Visual Phase Proof

Direct observation of the physical site transformation. Documenting the progression from degraded surfaces to code-compliant industrial standards.

Before

During

After

OPERATIONAL FLOW

PHASED EXECUTION PLAN

Our systematic approach ensures commercial properties are reconstructed with zero tolerance for error and 100% regulatory compliance.

01

Site Preparation and Traffic Control

Barricades and traffic-control devices were installed as required to secure the designated work areas while maintaining safe movement around the property. Concrete and asphalt perimeters were saw-cut to establish clean, straight vertical edges.

02

Concrete and Asphalt Removal

The designated concrete sidewalk, 6-inch pavement, curb, and failed asphalt sections were broken out, removed, and disposed of. Unsuitable base material beneath the asphalt was also removed where necessary.

03

Base Evaluation and Preparation

Exposed base and subgrade materials were evaluated, shaped, and graded. Asphalt repair areas were proof-rolled with a vibratory roller, and suitable aggregate base was installed and compacted wherever additional stabilization was required.

04

Concrete Installation

D&J installed 4 to 6 inches of 4,000 PSI ready-mix concrete for the new thickened-edge sidewalk, replacement pavement, and curb. The concrete was placed, finished, and graded to align with existing elevations and adjacent surfaces.

05

Full-Depth Asphalt Installation

An SS-1 bond coat was applied as required, followed by the installation and compaction of the 1100L asphalt binder course. The 5E1 asphalt surface course was then installed and compacted to create the finished pavement surface.

06

Joint Sealing and Final Cleanup

The saw-cut transitions between the new and existing asphalt were band-sealed as required. Construction debris, barricades, and traffic-control devices were removed following completion of the work.

Commercial Portfolio

Featured Case Studies

Documented Industrial Proof

Walgreens 4 striped lot 320
01
Viewing

Monroe, MI

Walgreen’s

Asphalt & $50k Saved

Bright Horizons finished lot 320
02
Viewing

Troy, MI

Bright Horizons

Lot Expansion

Freshly poured concrete slab for an ADA pad in front of a brick building
03
Viewing

Fremont, OH

Fifth Third Bank

Milling & 5E1 Paving

Concrete ADA-compliant ramp with metal handrails leading to the entrance of a Chase Bank branch, flanked by landscaped shrubs and a parking lot
04
Viewing

Dearborn, MI

Chase Bank

ADA Upgrades

Paved patch in a concrete parking lot with traffic cones and caution tape
05
Viewing

Clinton Township, MI

Morelli

Commercial Concrete & Asphalt Replacement