Case Study // 05
Morelli
— Clinton Township, MI
Location
Clinton Township, Michigan
Scope
Commercial Concrete & Asphalt Replacement
D&J Contracting completed targeted concrete improvements and full-depth asphalt replacement for the Morelli property. The project included a new thickened-edge sidewalk, replacement of 6-inch concrete pavement and curb, and reconstruction of failed asphalt areas using a compacted aggregate base, 1100L binder course, and 5E1 surface course.

PROJECT SPECIFICATIONS
PROJECT SPECIFICATIONS
The Morelli project combined concrete replacement with full-depth asphalt reconstruction in designated areas of the property.
OPERATIONAL LOG // MATERIAL VERIFICATION REF: MORELLI-CLNT-TWP-2026
01
Concrete Work
- 280.25 square feet of thickened-edge concrete sidewalk at the front of the building.
- 1,725 square feet of existing 6-inch concrete pavement removed and replaced.
- 5 linear feet of existing concrete curb removed and replaced.
- 4 to 6 inches of 4,000 PSI ready-mix concrete installed and finished to match existing elevations and surrounding surfaces.
02
Full-Depth Asphalt Replacement
- Failed asphalt pavement and unsuitable base materials removed to the required depth.
- Existing subgrade and base evaluated, reshaped, graded, and proof-rolled.
- Suitable aggregate base installed and compacted where required.
- SS-1 bond coat applied to prepared surfaces and existing asphalt edges.
- New 1100L asphalt binder course installed and compacted.
- New 5E1 asphalt surface course installed and compacted.
- Saw-cut perimeter joints band-sealed where the new pavement meets the existing asphalt.
Diagnostic Portfolio
Visual Phase Proof
Direct observation of the physical site transformation. Documenting the progression from degraded surfaces to code-compliant industrial standards.
OPERATIONAL FLOW
PHASED EXECUTION PLAN
Our systematic approach ensures commercial properties are reconstructed with zero tolerance for error and 100% regulatory compliance.
01
Site Preparation and Traffic Control
Barricades and traffic-control devices were installed as required to secure the designated work areas while maintaining safe movement around the property. Concrete and asphalt perimeters were saw-cut to establish clean, straight vertical edges.
02
Concrete and Asphalt Removal
The designated concrete sidewalk, 6-inch pavement, curb, and failed asphalt sections were broken out, removed, and disposed of. Unsuitable base material beneath the asphalt was also removed where necessary.
03
Base Evaluation and Preparation
Exposed base and subgrade materials were evaluated, shaped, and graded. Asphalt repair areas were proof-rolled with a vibratory roller, and suitable aggregate base was installed and compacted wherever additional stabilization was required.
04
Concrete Installation
D&J installed 4 to 6 inches of 4,000 PSI ready-mix concrete for the new thickened-edge sidewalk, replacement pavement, and curb. The concrete was placed, finished, and graded to align with existing elevations and adjacent surfaces.
05
Full-Depth Asphalt Installation
An SS-1 bond coat was applied as required, followed by the installation and compaction of the 1100L asphalt binder course. The 5E1 asphalt surface course was then installed and compacted to create the finished pavement surface.
06
Joint Sealing and Final Cleanup
Commercial Portfolio
Featured Case Studies
Documented Industrial Proof

Monroe, MI
Walgreen’s
Asphalt & $50k Saved

Troy, MI
Bright Horizons
Lot Expansion

Fremont, OH
Fifth Third Bank
Milling & 5E1 Paving

Dearborn, MI
Chase Bank
ADA Upgrades

Clinton Township, MI
Morelli
Commercial Concrete & Asphalt Replacement
FIELD OFFICE READY
HAVE A COMMERCIAL PROPERTY IN NEED OF RECONSTRUCTION?
Contact D&J Contracting Inc. for certified ADA upgrades, parking lot paving, and high-durability concrete installations. Professional bidding for facility directors and property managers.