SCOPE
FULL ADA RECONSTRUCTION
Reconstructing a high-traffic banking facility requiring absolute precision. D&J Contracting Inc. delivered certified ADA compliance upgrades, including handrail installation; removed and replaced existing concrete and the entire parking lot; installed 16 parking blocks, bollards, and signage; completed parking lot striping and pavement markings; and performed landscape restoration and final site cleanup.
SITE CERTIFIED: 100% ADA COMPLIANT
PROJECT SPECIFICATIONS
PROJECT SPECIFICATIONS
Reconstructing a high-traffic banking facility requires absolute precision. Our team replaced degraded asphalt, updated accessibility ramps to current federal ADA codes, and installed permanent safety fixtures.
OPERATIONAL LOG // MATERIAL VERIFICATION REF: CHASE-DBN-2024
01
ASPHALT PAVEMENT
Full extraction and deep-asphalt replacement using commercial-grade 4,000 PSI mix for heavy bank traffic.
02
ADA COMPLIANCE
Structural handrail installations and certified grades meeting all federal and municipal accessibility codes.
03
SAFETY FIXTURES
16 heavy-duty concrete parking blocks, permanent steel-core bollards, and regulatory site signage.
04
PAVEMENT MARKINGS
High-visibility yellow and ADA blue striping applied with industrial-grade traffic-bearing coating.
Diagnostic Portfolio
Visual Phase Proof
Direct observation of the physical site transformation. Documenting the progression from degraded surfaces to code-compliant industrial standards.
OPERATIONAL FLOW
PHASED EXECUTION PLAN
Our systematic approach ensures commercial properties are reconstructed with zero tolerance for error and 100% regulatory compliance.
01
Excavation & Demolition
Removal of existing degraded concrete, old asphalt pavement, and structural handrails without disrupting banking hours. Precision grading established for proper water runoff and foundation stability.
02
Structural Paving & Pouring
Poured high-PSI concrete surfaces, reconstructed the entire parking facility, and completed structural handrail installation. Each surface verified for ADA compliance grades using laser-level calibration.
03
STRIPING & FINAL DELIVERY
Mounted 16 parking blocks, fixed concrete bollards, applied high-durability parking markings, and completed landscape restoration. Final audit performed to guarantee 100% regulatory compliance.
FIELD OFFICE READY