— CASE STUDY // 04

Chase Bank
— Dearborn

LOCATION
DEARBORN, MICHIGAN

SCOPE
FULL ADA RECONSTRUCTION

Reconstructing a high-traffic banking facility requiring absolute precision. D&J Contracting Inc. delivered certified ADA compliance upgrades, including handrail installation; removed and replaced existing concrete and the entire parking lot; installed 16 parking blocks, bollards, and signage; completed parking lot striping and pavement markings; and performed landscape restoration and final site cleanup.

SITE CERTIFIED: 100% ADA COMPLIANT

PROJECT SPECIFICATIONS

PROJECT SPECIFICATIONS

Reconstructing a high-traffic banking facility requires absolute precision. Our team replaced degraded asphalt, updated accessibility ramps to current federal ADA codes, and installed permanent safety fixtures.

OPERATIONAL LOG // MATERIAL VERIFICATION     REF: CHASE-DBN-2024

01

ASPHALT PAVEMENT

Full extraction and deep-asphalt replacement using commercial-grade 4,000 PSI mix for heavy bank traffic.

02

ADA COMPLIANCE

Structural handrail installations and certified grades meeting all federal and municipal accessibility codes.

03

SAFETY FIXTURES

16 heavy-duty concrete parking blocks, permanent steel-core bollards, and regulatory site signage.

04

PAVEMENT MARKINGS

High-visibility yellow and ADA blue striping applied with industrial-grade traffic-bearing coating.

Diagnostic Portfolio

Visual Phase Proof

Direct observation of the physical site transformation. Documenting the progression from degraded surfaces to code-compliant industrial standards.

OPERATIONAL FLOW

PHASED EXECUTION PLAN

Our systematic approach ensures commercial properties are reconstructed with zero tolerance for error and 100% regulatory compliance.

01

Excavation & Demolition

Removal of existing degraded concrete, old asphalt pavement, and structural handrails without disrupting banking hours. Precision grading established for proper water runoff and foundation stability.

02

Structural Paving & Pouring

Poured high-PSI concrete surfaces, reconstructed the entire parking facility, and completed structural handrail installation. Each surface verified for ADA compliance grades using laser-level calibration.

03

STRIPING & FINAL DELIVERY

Mounted 16 parking blocks, fixed concrete bollards, applied high-durability parking markings, and completed landscape restoration. Final audit performed to guarantee 100% regulatory compliance.

FIELD OFFICE READY

HAVE A COMMERCIAL PROPERTY IN NEED OF RECONSTRUCTION?

Contact D&J Contracting Inc. for certified ADA upgrades, parking lot paving, and high-durability concrete installations. Professional bidding for facility directors and property managers.

Call Now Button